A complex of buildings implemented as a renovation of an existing office building with the addition of a new facility and an underground garage. The new office building is located parallel to the existing Centromor office building, it is one floor lower than the existing one and its height corresponds to the BGŻ building. The facility was completed in the field of construction and finishing works with a complete set of internal installations. Some rooms are equipped with air conditioning. The standard of workmanship and equipment of the facility classifies it in the highest category.
Both buildings were covered with gable, interpenetrating roofs covered with tiles. The elevations are made of aluminum and glass with parts made of clinker bricks.