Korporacja Budowlana DORACO realized collective residence building with land development and the necessary technical infrastructure at ul. Robotnicza in Gdańsk. The works were performed in the “design and build” system.
The 6-story building with a total area of 11145.7 m² and a cubature of 40162.04 m³, fully adapted to the needs of the disabled, has 279 single and double rooms. There is also an entrance lobby with a reception desk on the ground floor. Communication is provided by 3 elevators and 3 staircases. Its architecture refers to the style of the neighboring buildings in the Young City.