The investment included construction of container storage squares together with all the necessary infrastructure.
The transportation between the storage sites is provided by a with a concrete road and reinforced concrete slabs with drainage line. Due to the problematic ground conditions the whole area will be enhanced through concrete columns and geotechnical mattresses. At the first stage of construction Doraco constructed all necessary utilities for the water supply and storm water drainage, as well as energy feed cable SN 15 kV and 0.4 kV NN. The area is fenced and equipped with electric road lighting and derricks.