Reconstruction of the Industrial Quay on the section 150 mb including venturing into reinforced concrete sheet piling with a length of 17.5 m over a distance of 150 meters.

As part of the overhaul waterfront facilities, the work included: the construction of the upstream beam slinger track, reconstruction of the upstream beam slinger track salt loaders in the length of 83.3 m, grids, networks, and water and sewerage connections with the separator and sludge, pavements drainage channels, and also made ​​surface of granite in a strip with a width of approx. 12 m over a length of reconstructed wharf – 150 m.