Objects witha a very high standard of finishing, equipped with the structured cabling installation of fire alarm, television surveillance system and alarm system against burglary and assault.
The scope of work included:
- A comprehensive construction of a flower hall of cubic area of 45.861 m3
- Office building of reinforced technical building with a boiler room and oil-gas and transformer station with a capacity of 3.086 m3
- One floor building piętrowego budynku with reinforced concrete structure of cubic area of 11.683 m3,
- The gateway construction