The scope of work included the renovation of the building including demolition, construction finishing works: sanitary, water and sewage, ventilation, electrical installation works, roofing, cladding and stone as well as the execution of landscaping, roads and sidewalks. As part of the renovation Doraco restored the original facade of the wall, undertook renovation of the door woodwork, restored historic railings and replaced roof surfaces with plain tile.

Due to the very high humidity of the object, after drying, we made special waterproofand moistureproof insulations. The object was finished under “turnkey” with fully equipment disco room.

Total Area: 2.792 m2

Cubic Area: 14.600 m3

Project Timeframe: from December 2002 to October 2003