Modernization and reconstruction of the General Cargo Base Ostrów Grabowski in Port in Szczecin
 

An investment carried out on the General Contractorship basis and located in Port in Szczecin was divided into two main stages. The scope of work during the first stage included preparing 13,5 hectares of ground for an infrastructure for the General Cargo Base (with construction of overloading embankment having 560 000 m3 of cubic capacity).An expansion and modernization of water mains, pipelines, sewage treatment plants and telecommunication systems belong to the second stage of the investment.


Execution period: 09.02 - 09.05
Construction Manager: Jerzy Bartoszuk