The investment includes the following elements: two cranes (Liebherr LPS 600) with a capacity of 60 t cargo each, renovation of the pier (INTOP) conveyor system (RBL-Pritip), stacker loader (Famak), new storage areas, conveyor connecting the two terminals, upgrading the existing system of conveyor belts, wagons loader, dust reduction system, drainage system, etc.

The terminal is designed in such a way as to ensure high performance for the transshipment of bulk cargoes, particularly coal and iron ore, while applying the best available technologies in the field of environmental protection.


fot. Aeromedia dla DORACO