Reconstruction of 258 m quay wall including reinforced concrete sheet piling with (245.1 m) and 290m adjustable bottom floor of Quay West.

The scope of work included:

  • execution of navigating bridge of 38.5 m in length
  • strengthening of waterfront bottom floor,
  • networks and connections of water and sewerage,
  • drainage line for the quays, proof insulation,
  • thermal insulation of the building
  • lighting-related electricity networks at waterfront.

fot. DORACO