Civil engineering works are carried out under the responsibility of II, IV and V-go-go project. The scope of works included the gravity and discharge manifolds. The work was technically difficult because of the location of one section of the drain in the immediate vicinity of the railway line and the access road to the store fuel in Kiełpinku and foundation of another section of the pipeline in the meadows of peat in Pępowo. As part of the IV-also made him a well-pumping with a diameter of 5 m and a depth of 8-meter and pumping capacity buildings with land development around them.
Delivery time: from April 1992 to October 1994 in stages